by 17031 » Sat Aug 03, 2013 3:50 pm
Thanks, this is what I thought. The limiting factor then will be parts avaliabiltity, i.e. what happens when the current stash of parts is gone. Can new parts be designed and built? The FAA exersizes such tight control and is not very cooperative, will it be possible to design and make with new parts, not considering the cost?